Back

body shell checklist E8+ car..

  Work List Jobs Tick Notes
1 Double skin front turrets      
2 Double skin NS engine mounting bracket      
3 Weld seams around suspension mounting points only      
4 Fit roll cage      
5 Fit washers to the front suspension subframe - to make obsolete the oval hole to right hand side & reinforce rear mounting point - check castor first to establish where the hole centre should be to the same to eliminate the original assembly manufacture tolerance errors      
6 Leave hole on NS below engine mount      
7 Reinforce rear suspension pickup points - fit threaded tube through the rail for the rear upper link (M10 x 1.25      
8 Under tunnel reinforcement plate to weld edges      
9 Extra plate to front sub frame mounts particularly front into the chassis leg.      
10 Plate around front sub frame rear bolt hole      
11 Fit seat mountings (rails only) - check positioning & Fit crutch strap mounting point nuts and reinforcement plates 75x75mm x 1.2mm thick with the nuts centred across the plate - BTR staff to mark positions - centred between the seat frame bracket mounting holes. Fit seat belt eye mounting points to the transmission tunnel      
12 Remove jack holder bracket Fit jack mounting bracket to suit the new specification jack - RHS floor      
13 Remove surplus studs in general      
14 Weld hole to rear wheel arches      
15 Fit spare wheel carrier tubes - to boot area fit retainers to spare wheel retaining strap - 2 wheels      
17 Fill holes to std front brake hoses      
18 Fill floor pan holes to interior - steel disc welded to position      
19 Fill floor pan holes to boot area      
20 Inspection to shell overall and rectification to seams as required      
21 Remove sound deadening complete      
22 Sump guard mounting bracket weldnuts to install      
23 Rear cross member reinforcement gussets      
24 Earth points - fit Wurth weld nuts      
25 Mud flap points fit weld nuts as required      
26 Centre mud flap mounting points - fit weld nuts      
27 Weldnuts to arch liner panel mountings to replace plastic clips      
28 Seat belt mounting points (min 75x75mm x 1.2mm reinforcement plates required)      
29 Floor guard retaining (Wurth) weld nuts to fit      
30 Make and fit reinforcement plates to front panel around the production bonnet height adjust rubber point. Fit UNF half nut to retain the bonnet pin to the underside of the same plate, centred on the bonnet adjust rubber fitting point hole      
31 Replace plastic sill retaining clips to sill underside with M5 Wurth weld nuts      
32 Fit weld nuts to the interior floor pan to retain co-drivers footplate panel and drivers floor guard      
33 Remove standard front and rear brake flexible hose support brackets entirely      
34 Remove seat belt mountings from the rear wheel arches      
35 Remove seat belt mounting from the floor pan under rear seat area      
36 Captive fasteners to ACD box cover & res; cover to fit      
37 Confidential      
38 Confidential      
39 Confidential      
40 Confidential      
41 Remove door SIP bars      
42 Confidential      
43 Blank Ariel hole - production radio @ A pillar top - drivers side      
44 Confidential      
45 Drill extinguisher mounting bracket holes      
46 Fit sill jacking point tubes & reinforcements      
         
  Inspection to Jobs Tick notes
1 Bodyshell      
2 Roll cage      
3 Door fit      
4 Seat rails in correct position and belt mountings fitted      
5 Other additional items as listed to job list      

 

Contact: